Status: Published 28 November 2026 (Version 1). Suggested URL: /electronics-supplier-quotation-rfq-checklist/ Meta description: A lower unit price does not necessarily mean a lower purchasing cost. Learn how to write an RFQ for electronics suppliers in China, what a complete quotation must include, and how to compare three quotations fairly.
A supplier quotes $4.80 per unit. Another quotes $5.20. The cheaper one looks like the better deal — until you discover that its price excludes custom packaging, its minimum order is four times larger, its sample takes 30 days, and nobody has confirmed whether the battery is the one you specified.
A lower unit price does not necessarily mean a lower purchasing cost. Two quotations are only comparable when they describe the same product, the same configuration, the same quantity and the same commercial terms. This guide explains how to get there: what information to send suppliers before requesting a quotation, what a complete quotation must include, and how to compare quotations fairly.
This guide is the second step in a four-part buying sequence. Our market guide explains where to source electronics in Huaqiangbei. Our supplier verification guide explains how to check whether a supplier is legitimate and who actually makes the product. Our pre-shipment inspection guide explains what that inspection checks and how sampling works. This guide covers the step between sourcing and verification: turning a product requirement into comparable, documented supplier quotations.
1. Why electronics quotations are difficult to compare
Quotations for electronics are hard to compare for five reasons, and price is only one of them.
First, the products may not be the same. Two suppliers can quote a "Bluetooth speaker" or a "power bank" with different chipsets, batteries, materials, capacities and accessories. Different components explain price differences, and a quotation that does not name them cannot be compared with one that does.
Second, the quantities may not be the same. A supplier quoting 500 units and a supplier quoting 2,000 units are quoting different orders. Minimum order quantities (MOQs) can affect the total order commitment, the quoted unit price and how a one-off tooling cost is spread across the order.
Third, the cost boundaries may not be the same. One quotation may be EXW at the factory gate, another FOB at the port of shipment, another CIF at your destination port. The numbers look different because they include different costs. Section 7 explains how to read these terms.
Fourth, the extra charges may not be the same. Sample charges, tooling or mould charges, customisation charges and packaging costs may be included in one quotation and listed separately — or not mentioned at all — in another.
Fifth, the terms may not be the same. Payment terms, quotation validity, production lead time and what happens to defective goods all affect the real cost and the real risk. A quotation is a commercial document describing a proposed product, price and set of terms — not just a unit price.
The rule for this whole guide: compare specifications first, then terms, then price. A price ranking made before the specifications match is not a comparison.
2. What information to prepare before contacting suppliers
Before you contact any supplier, write down the product requirement in full. A supplier cannot quote accurately on a product description that says only "Bluetooth earbuds" or "power bank". The more precise your request, the more comparable the replies.
Prepare these ten items before you send a request for quotation (RFQ):
- Product identity: product name, reference photos, model number or drawing.
- Technical specifications: dimensions, materials, performance and electrical requirements.
- Components: chipset, battery, display, connectors and other important components, where applicable.
- Configuration: colour, capacity, version, accessories and included parts.
- Compliance: destination market and applicable regulatory requirements.
- Branding: logo, packaging, labels and customisation.
- Quantity: initial order quantity and expected repeat quantities.
- Packaging: retail packaging, protective packaging and carton requirements.
- Samples: sample quantity, price and delivery expectations.
- Delivery: destination country, required date and preferred shipping arrangement.
For electronics, describe important requirements at the level needed to distinguish acceptable from unacceptable products. Depending on the product, this may include battery chemistry and rated capacity, input and output ratings, connector type, supported wireless standards, chipset or component part number, firmware version, operating conditions, dimensions and tolerances, and required performance or test methods. State whether a named component is mandatory or whether an equivalent is acceptable. Do not assume that two products are equivalent just because their product names or appearance are similar.
Make clear that different electronics products need different specifications. A power bank, a Bluetooth speaker, a charging cable and a circuit board cannot be adequately described using one generic checklist. If a specification does not apply to your product, say so — do not leave it blank and let the supplier guess.
Also decide, before you ask for prices, what you will not accept. Write down the specification points that are mandatory (for example, a particular battery capacity or a required certification) and the points where a substitute is acceptable. Suppliers can only quote against the requirements they have been given and the assumptions they make. Put mandatory requirements, acceptable alternatives and required evidence in writing. Before placing an order, carry the agreed specification into the purchase contract or order confirmation; do not assume that sending an RFQ alone makes every requirement a contractual obligation.
Keep three things distinct when you read a supplier's reply:
- Buyer requirement: what you need.
- Supplier declaration: what the supplier says it can provide.
- Evidence: a drawing, component datasheet, test report, certificate or sample that supports the declaration.
That distinction is particularly important for batteries, wireless products and destination-market compliance.
3. The electronics RFQ checklist
Use this checklist when you write your RFQ. It is the same list as section 2, organised as a table you can copy into your request.
| Information | What the buyer should specify |
|---|---|
| Product identity | Product name, reference photos, model or drawing |
| Technical specifications | Dimensions, materials, performance and electrical requirements |
| Components | Chipset, battery, display, connectors and other important components, where applicable |
| Configuration | Colour, capacity, version, accessories and included parts |
| Compliance | Destination market and applicable regulatory requirements |
| Branding | Logo, packaging, labels and customisation |
| Quantity | Initial order quantity and expected repeat quantities |
| Packaging | Retail packaging, protective packaging and carton requirements |
| Samples | Sample quantity, price and delivery expectations |
| Delivery | Destination country, required date and preferred shipping arrangement |
For electronics products, add these fields where they apply. They are product-dependent examples, not a universal specification for all electronics:
- Model or configuration for each variant, including colour or capacity.
- Required tolerances and test or measurement method.
- Mandatory component part numbers and permitted substitutions.
- Required product documents and compliance evidence for the destination market.
- Carton quantity, dimensions, gross weight and packaging requirements.
- Inspection and acceptance criteria.
Send the same RFQ to every supplier you approach. If each supplier receives a different description, their quotations will describe different products, and no comparison is possible. Keep the same specification and quantity basis, and share non-confidential clarifications consistently. Do not disclose another supplier's confidential quotation. When a supplier asks a clarifying question, send the answer to all suppliers, so every quotation is based on the same information.
Keep a copy of every RFQ you send, with the date. When a quotation arrives, check it against the RFQ: did the supplier answer every item, or did it skip some? A quotation that ignores your specification is not a complete quotation, even if its price looks attractive.
4. What to ask suppliers to include in a comparable quotation
Ask every supplier for the same core information, adding product-specific and shipment-specific details where they apply. If an item is missing, ask for it in writing before you compare prices.
- Legal seller name.
- Exact product model and specification.
- Unit price and currency.
- MOQ and price breaks.
- Sample price and sample lead time.
- Production lead time.
- Tooling or mould charges, if applicable.
- Customisation charges.
- Packaging costs.
- Payment terms.
- Quotation validity.
- Incoterms rule and named place.
- Whether shipping, insurance, duties and taxes are included or excluded.
- Quotation date and quotation reference number.
- RFQ reference or specification revision being quoted.
- Exact order quantity to which each price applies.
- Whether the price is per unit, set, piece or another unit of measure.
- Whether the price is for each model or variant separately.
- Named delivery place or port, not just the Incoterms rule.
- Incoterms edition, for example, Incoterms® 2020.
- Freight mode and any stated freight or destination charges.
- Inspection or testing charges, if applicable.
- Any assumptions, exclusions or substitutions.
A quotation that says only "$4.80 per unit" is not sufficiently detailed for a reliable purchasing decision. It does not say which product, which configuration, how many units, what is included, how long the price holds, or when the goods will be ready. Do not rank it against a complete quotation: the two are not describing the same offer.
Check the quotation date and validity period first. If the quotation has expired, ask the supplier to reconfirm the price, specification and terms before relying on it. Whether a quotation creates a binding offer depends on its wording, acceptance, the contract and the applicable law; do not assume that an expired quotation can still be accepted on its original terms. Check the currency and compare quotations in a common currency using an exchange rate and date that you record. Also account for bank conversion fees and clarify who bears exchange-rate changes between quotation, deposit and final payment. A quotation in USD and one in CNY may describe the same commercial offer in different currencies; the important point is to compare them on a consistent basis.
Check the payment terms in the same way. A quotation that requires full payment before production and a quotation that requires a deposit with the balance after inspection describe different risks, even at the same unit price. Our supplier verification guide explains how to check that the payment beneficiary matches the contracting party; use that check before you pay anything.
5. How to compare three supplier quotations fairly
The method is simple: match the specifications first, then the terms, then the price. The worked example below shows how it works.
An illustrative comparison — not real quotations
The table below is a hypothetical example created to demonstrate the comparison method. The figures are illustrative only. They are not real supplier quotations, not market prices, and not a record of any actual transaction. Do not use them as a price reference.
| Item | Supplier A | Supplier B | Supplier C |
|---|---|---|---|
| Unit price | $5.20 | $4.80 | $5.05 |
| MOQ | 500 | 2,000 | 500 |
| Sample charge | $40 | $25 | $35 |
| Custom packaging | Included | Extra | Included |
| Production lead time | 20 days | 30 days | 25 days |
| Battery specification | Confirmed | Unclear | Confirmed |
Supplier B has the lowest stated unit price, but its MOQ is four times higher. At the listed minimum quantities, the illustrative product totals would be $2,600 for Supplier A (500 × $5.20) and $9,600 for Supplier B (2,000 × $4.80), before any extra packaging, shipping or other charges. These totals are not a like-for-like price comparison because the order quantities differ. To compare the suppliers fairly, ask each one to quote the same quantity and specification. If a supplier cannot meet that quantity, record the difference rather than treating the unit prices as directly comparable.
The table does not provide enough information to calculate a final landed cost. Supplier B's additional packaging charge is unknown, and the battery specification has not been confirmed. These are unresolved quotation items, not costs or product characteristics that the buyer should guess.
Before choosing, establish these six points for every supplier:
- Are the batteries equivalent?
- Are the components and performance specifications identical?
- Is packaging genuinely comparable?
- Are testing and compliance documents available?
- Are production lead times measured from deposit, sample approval or another milestone?
- Are shipping and other charges included?
Lead time deserves a specific question, because suppliers measure it from different starting points. A lead time of 20 days from deposit is not the same as 20 days from sample approval. Ask each supplier to state the starting point in writing, and compare lead times on the same basis.
Comparing the total cost to the same destination
For each supplier, calculate the cost for the same product specification, order quantity, destination and transport arrangement. Record the product total, one-off tooling and customisation charges, packaging, freight, insurance, export and import handling charges, customs duties and taxes, inspection charges, and local delivery where applicable. Keep one-off costs separate from recurring unit costs. Do not assume a charge is included merely because a supplier has not listed it.
The final amount depends on the destination country, customs classification, applicable duties and taxes, shipping arrangement and importer-specific charges. Treat an estimate as an estimate until the relevant freight, customs and tax costs have been confirmed.
This is the point of the exercise: a quotation comparison must begin with specification matching, not price ranking. The cheapest unit price on a mismatched specification is not a saving.
6. MOQ, sample charges, tooling and customisation costs
Different quantities that suppliers may quote
"MOQ" is not one number. Suppliers may quote different quantities, and a figure labelled as a quantity is not necessarily a minimum order:
| Quantity | Meaning |
|---|---|
| Sample quantity | Number of units supplied for evaluation; it may have a separate price and lead time |
| Standard-product MOQ | Minimum order for the supplier's standard, non-customised product |
| Custom or OEM MOQ | Minimum order for a customised product or manufacturing arrangement |
| Packaging MOQ | Minimum quantity for custom-printed or specially made packaging |
| Price-break quantity | Order quantity at which a particular unit price applies |
A supplier may sell five standard products but require 500 units for custom branding. Do not record "MOQ 5" when the figure you were given was the sample quantity, and do not record "MOQ 500" when it was the custom packaging minimum. Ask which quantity each number refers to, and write it down. Ask whether each MOQ applies per model, colour, capacity, configuration, order or shipment, or to a combined order. A packaging MOQ may be different from the product MOQ, and a quoted price break may require a larger quantity than the minimum order. A supplier's minimum for one model may not be the same as the minimum for a mixed-variant order.
Price breaks
Suppliers commonly quote different unit prices at different quantities. Ask for the price at each quantity you are considering — for example, your initial order quantity and your expected repeat quantity — and ask what changes between them. A price break is only useful if you know the quantity at which it applies and whether the specification stays the same.
Sample charges
A sample is a separate purchase from the bulk order, and it has its own price and lead time. Before you pay for a sample, confirm in writing: the sample price, the sample lead time, whether the sample is the same specification as the bulk product, whether the sample charge is refundable against a bulk order, and who pays the sample shipping. A sample that differs from the production specification tells you nothing about the product you will receive.
Tooling and mould charges
For customised products, a supplier may charge for tooling or a mould. This may be a one-off charge, depending on the tooling arrangement and supplier's terms, separate from the unit price. Before you agree to it, confirm in writing: the amount, whether it is a one-off or per-order charge, who owns the tooling, what happens to the tooling if you stop ordering, and whether the charge is refundable against future orders. A tooling charge is not a unit cost, and it should not be compared as if it were one.
Customisation charges
Customisation — logo printing, custom colours, custom packaging, custom firmware — is priced separately from the standard product. Ask for each customisation item to be listed and priced on its own line. A quotation that bundles customisation into the unit price without itemising it cannot be compared with a quotation that lists it separately.
7. EXW, FOB, CIF and DAP: understanding what the price includes
A quotation price means nothing without the delivery term attached to it. The delivery terms used in international trade are the Incoterms rules, published by the International Chamber of Commerce (ICC). The current edition is Incoterms® 2020 (ICC Publication No. 723E, published September 2019, in force 1 January 2020). It contains 11 rules: seven for any mode of transport and four for sea and inland waterway transport only. Incoterms® 2020 remains the current published edition as of 28 November 2026. ICC's 2026 Global Policy Commissions Workplan says work has begun on revising the rules, laying the groundwork for Incoterms® 2030. ICC Netherlands has reported a late-2029 target for the launch, but that date should be attributed to ICC Netherlands rather than presented as a confirmed publication date announced by ICC globally.
The four rules buyers most often see on electronics quotations are:
| Rule | Full name | Transport | Who pays main carriage | Where risk passes to the buyer | Export clearance | Insurance obligation under the rule |
|---|---|---|---|---|---|---|
| EXW | Ex Works | Any mode | Buyer | At the seller's premises, goods not loaded | Buyer | No obligation |
| FOB | Free On Board | Sea and inland waterway only | Buyer | On board the vessel at the port of shipment | Seller | No obligation |
| CIF | Cost, Insurance and Freight | Sea and inland waterway only | Seller, to the port of destination | On board the vessel at the port of shipment | Seller | Seller, minimum cover (Institute Cargo Clauses (C) or similar) |
| DAP | Delivered at Place | Any mode | Seller, to the named destination | At the named destination, ready for unloading | Seller | No obligation |
Source: ICC, Incoterms® 2020 (ICC Publication No. 723E). The table summarises the main allocation; the full rules set out further obligations, including packaging, notices and delivery documents.
Always write the full rule, named place or port, and edition in the quotation and contract — for example, "FCA [named terminal], Incoterms® 2020." A rule without a precise named place or port leaves important delivery and cost details unclear. For DAP, specify the actual destination address or delivery point, not merely the destination country.
Read the table carefully. Under FOB and CIF, risk passes to the buyer when the goods are on board the vessel at the port of shipment — even though under CIF the seller pays the freight and the insurance to the destination port. Paying for transport is not the same as carrying the risk. Under DAP, risk passes only when the goods arrive at the named destination, ready for unloading.
Two cautions. First, FOB and CIF are sea and inland waterway rules. For containerised shipments, FCA is often more appropriate than FOB when the buyer arranges the main carriage, because the seller commonly hands the container to a carrier or terminal before it is loaded aboard the vessel. If the seller arranges and pays for the main carriage, CPT or CIP may be more appropriate, depending on whether insurance is included. The correct choice depends on the actual delivery arrangement and the named place. Check the ICC guidance rather than treating FOB as the default for every sea shipment. If your goods travel in a container and the quotation says FOB, ask the supplier to confirm the rule in writing.
Second, Incoterms do not settle every question. Incoterms do not determine when ownership of the goods passes, the method or timing of payment, or the remedies and liability for breach of the sales contract, such as supplying non-conforming goods or delivering late. Those matters need to be addressed separately in the sales contract. Incoterms do allocate specified seller and buyer obligations, costs and risks connected with delivery and transport. An Incoterms rule is not a substitute for a detailed contract. It does not replace the specification, the inspection terms or the remedies for defective goods.
When you compare two quotations, always ask these five questions about the delivery term:
- What transport costs are included?
- Where does risk transfer?
- Who arranges export clearance?
- Who arranges insurance, where applicable?
- Which destination charges remain payable?
A CIF price that looks higher than an FOB price may be cheaper once you add the freight and insurance the FOB price excludes. Compare the total cost to the same destination, not the headline number.
8. Questions to resolve before approving a sample
A sample lets the buyer evaluate a physical product against the requirements in the RFQ. Before you approve it, resolve these questions in writing:
- Is the sample the same specification as the bulk product, including components, battery and configuration?
- Who pays for the sample, the sample shipping and any sample tooling?
- Is the sample charge refundable against a bulk order?
- How long does sample approval take, and does the production lead time start from deposit or from sample approval?
- What happens if the sample fails: rework, a new sample, or a refund, and who pays?
- What inspection and acceptance terms apply to the bulk order?
Approving a sample confirms that the identified sample is acceptable against the agreed requirements. It does not prove that every unit in the production lot will match it. Put the approved sample reference, final specification, inspection method, acceptance criteria and treatment of non-conforming goods into the order documents. If a pre-shipment inspection is required, agree who arranges and pays for it, when it takes place, and what happens if the lot fails.
Our supplier verification guide explains the order of these steps in detail: obtain a sample equivalent to production, approve the exact specification in writing, confirm the production site, put inspection rights and remedies in the contract, and carry out a pre-shipment inspection before final payment. Our pre-shipment inspection guide explains what that inspection checks and how sampling works.
Keep the approved sample, identified and retained, so production goods can be compared against it. A sample that is lost or never identified cannot be used as the standard for the bulk order.
9. A copyable electronics RFQ template
Copy the template below into your own request. Replace the bracketed items with your product details, and send the same version to every supplier.
Subject: Request for Quotation — [product name]
Dear Supplier,
We are requesting a quotation for the following product:
Product: [product name, model or reference]
Specification: [dimensions, materials, performance, electrical requirements]
Components: [chipset, battery, display, connectors]
Configuration: [colour, capacity, version, accessories]
Compliance: [destination market and applicable requirements]
Branding and packaging: [logo, retail packaging, carton requirements]
Quantity: [initial order quantity; expected repeat quantity]
Delivery destination: [country, city, postcode and named delivery point, where known]
Required delivery date: [date or acceptable delivery window]
Preferred transport mode: [air, sea, rail, courier or undecided]
Requested delivery term: [rule, named place and edition, if known; otherwise ask the supplier to quote options]
Specification reference or revision: [attached document name and revision/date]
Mandatory requirements: [requirements that must be met]
Acceptable alternatives: [requirements for which equivalent components or configurations may be proposed]
Required inspection: [inspection type, acceptance criteria and who arranges it]
Please quote the following, each on its own line:
1. Unit price and currency
2. Minimum order quantity and price breaks
3. Sample price, sample lead time and sample shipping
4. Production lead time, and the date it is measured from
5. Tooling or mould charges, if any
6. Customisation charges, itemised
7. Packaging costs
8. Payment terms
9. Quotation validity date
10. Incoterms rule, named place or port, and edition (for example, Incoterms® 2020)
11. Whether shipping, insurance, duties and taxes are included or excluded
Please also confirm: the legal seller name, the manufacturer of the product, and whether any part of production is subcontracted.
Thank you,
[your name, company, contact details]
A template is only useful if you use the same one for every supplier and keep a dated copy of each request. When a supplier's reply omits an item, ask for it — do not fill the gap yourself.
10. Own Buying Desk: a documented supplier comparison
This section is our own buying record, not a client project. These own-buying-desk examples illustrate how we screened product information and decided whether to continue a sourcing search. They are not evidence of completed customer projects, independently verified supplier performance, product quality or successful bulk production.
Preliminary online listing comparison: portable lint removers
On 25 November 2026, we carried out a preliminary online listing comparison for rechargeable fabric shavers with an LED display and a three-speed requirement for our own Shopify store. We reviewed two AliExpress listings. This was a listing-based screening exercise, not a formal RFQ: we did not obtain comparable supplier quotations, order samples, inspect products or visit factories.
| Factor | Supplier A | Supplier B |
|---|---|---|
| Displayed listing rating | 4.9 stars | 4.9 stars |
| Displayed review count | 4,774 | Not recorded |
| Displayed sold count | Not recorded | 558 |
| Three speeds disclosed in listing | Not disclosed | Disclosed |
| Rechargeable, LED display | Stated on listing | Stated on listing |
| Sourcing price | Not published — under review | Not published — under review |
Source: AliExpress listing pages for both sellers, checked 25 November 2026 at 15:58. Supplier identities are anonymised. The ratings are platform-reported figures, not an independent product-quality assessment. Dimensions (165 x 70 x 87) and the digital display reading are listing claims shown in product images, not measurements taken by our team.
Both listings displayed a 4.9-star rating. Supplier B's listing explicitly stated three speeds; Supplier A's listing did not disclose the number of speeds. This made Supplier B's listing more closely aligned with our stated requirement on the information available, but it did not establish that the physical product had the claimed specification. We created a Shopify product listing based on the supplier's listing information. The product had not been sampled or independently verified. This was a preliminary listing-screening decision, not sample approval, supplier verification or a confirmed purchasing decision.
Two limits matter. First, the sourcing price is not published here: two versions are on record and have not been reconciled, so no sourcing price is stated. Second, all specifications come from supplier listing text and product images and were not physically measured or tested. No factory audit was carried out and no defect records exist, because no physical inspection took place.
Stopping an order when the specification cannot be matched
The same method can also tell you when not to order. In a sourcing check for our own store, we stopped a rose candle mould purchase: no supplier had the exact ring mould our reference video needed, and the closest options did not publish the hole size, so the fit could not be confirmed. The check was based on supplier listings, not samples or formal quotations. This is an anecdotal own-buying-desk note, not evidence that a formal RFQ comparison was completed. A quotation that does not match the specification is not a cheaper alternative; it is a different product. Walking away from a mismatched quotation is part of the method, not a failure of it.
11. What to confirm before placing the order
Use this checklist before you pay a deposit. If you cannot tick an item, write down what is missing and who will provide it.
Product and specification:
- Exact product model and configuration confirmed in writing
- Components, battery and performance specifications confirmed
- Compliance requirements for the destination market confirmed
- Sample approved, identified and retained
Quotation and price:
- Unit price, currency and quotation validity confirmed
- MOQ and price breaks confirmed
- Sample, tooling, customisation and packaging charges itemised
- Incoterms rule and named place confirmed in writing
- Shipping, insurance, duties and taxes confirmed as included or excluded
- Total cost to the destination calculated on the same basis for every supplier
Supplier and transaction:
- Legal seller name and manufacturer identified (see our supplier verification guide, section 1)
- Exporter and payment beneficiary reconciled with the contract
- Payment terms and bank instructions independently confirmed
- Signatory authority and company seal checked
Production and inspection:
- Production site confirmed
- Production lead time confirmed, with the starting point stated
- Inspection rights, acceptance criteria and remedies in the contract
- Pre-shipment inspection arranged before final payment (see our pre-shipment inspection guide)
An unchecked item is not automatically a reason to walk away, but an unchecked item that nobody can explain is a reason to pause and resolve the issue before proceeding. Do not let a low price or a tight deadline push you past a stop.
12. Sources, method and limitations
This guide combines official trade guidance, a practical buyer checklist and clearly labelled examples. The hypothetical supplier comparison in Section 5 uses invented figures solely to demonstrate the comparison method; these figures are not quotations, market prices or benchmarks. The own-buying-desk examples in Section 10 are based on our own dated sourcing records and are not customer projects or independent supplier audits.
External factual claims about Incoterms are attributed to the official ICC and US International Trade Administration sources listed below. The Incoterms sources were checked on 28 November 2026. The lint-remover listing comparison relates to online listings checked on 25 November 2026. No physical sample was inspected and no supplier quotation was obtained for that comparison.
This guide is a method, not a guarantee. It explains how to request and compare electronics quotations. It does not describe any customer order, and it does not present any customer result. It contains no market prices, no supplier failure rates and no industry averages. We have not identified reliable evidence that would justify publishing market-wide supplier failure rates, average prices or industry-wide MOQ figures in this guide.
These own-buying-desk examples illustrate how we screened product information and decided whether to continue a sourcing search. They are not evidence of completed customer projects, independently verified supplier performance, product quality or successful bulk production.
Trade rules change: before you rely on a delivery term, check the current edition on the official source named below.
The short version
Do not compare electronics quotations by unit price alone. Send every supplier the same written RFQ. Ask for the same core information in every quotation. Match the specifications first, then the terms, then the price. Check what the delivery term includes, and calculate the total cost to the same destination. Keep a dated copy of every request and every reply. A quotation that does not match your specification is not a cheaper alternative; it is a different product.
Sources
Each source is labelled by type: [Primary] is the official document itself; [Official guidance] is guidance published by the issuing body or a government agency; [Own Buying Desk record] is our own dated sourcing record.
- [Primary] International Chamber of Commerce (ICC), Incoterms® 2020, ICC Publication No. 723E (published September 2019, in force 1 January 2020): 11 rules, seven for any mode of transport (EXW, FCA, CPT, CIP, DAP, DPU, DDP) and four for sea and inland waterway transport only (FAS, FOB, CFR, CIF). https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/
- [Primary / official guidance] International Chamber of Commerce (ICC), Incoterms® 2020 Checklist and Flowcharts, ICC Publication No. PUB817E (2022): a decision-making checklist and sample flowcharts for choosing the right Incoterms rule for a B2B contract of sale, including common cost-allocation problems such as terminal handling, loading and unloading charges. https://2go.iccwbo.org/incoterms-2020-checklist-flowcharts-choosing-the-right-incotermsr-rule.html
- [Official government guidance] US International Trade Administration, "Know Your Incoterms": Incoterms do not address all the conditions of a sale, do not identify the goods or state the contract price, do not reference the method or timing of payment, and do not fix when title passes from seller to buyer. https://trade.my.site.com/article2?id=Incoterms-Overview
- [Primary source for ICC's workplan] International Chamber of Commerce (ICC), Global Policy Commissions Workplan 2026: "Begin work on the revision of the Incoterms rules, laying the groundwork for Incoterms® 2030." https://icc-schweiz.ch/media/attachments/2025/11/07/2026_icc_policy-commissions_draft-workplan-for-ncs.pdf
- [Official ICC national committee guidance] ICC Netherlands, "Incoterms® 2030: a Dutch Working Group is being formed", 31 August 2026: reports that the launch of Incoterms® 2030 is currently planned for late 2029. https://www.iccwbo.nl/news-1
- [Own Buying Desk record] Own Buying Desk, "Comparing Two Suppliers for a Portable Lint Remover", checked 25 November 2026: AliExpress listing pages, ratings, review counts and stated specifications. Sourcing price not published — under review. "Why We Stopped a Rose Candle Mold Purchase": ring mould check based on supplier listings. Full records: Our Work & Field Notes, entries 01 and 03. https://sourcingagencyinchina.com/our-work
Sources checked 28 November 2026: items 1–5. Item 6 is our own dated buying record.
Related buyer guides
- "Huaqiangbei Electronics Market: 2026 Data, Product Categories and Buyer Guide" at https://sourcingagencyinchina.com/article/huaqiangbei-electronics-market-data
- "How to Verify an Electronics Supplier in China: Factory, Trading Company, Documents and Red Flags" at https://sourcingagencyinchina.com/article/how-to-verify-electronics-supplier-china
- "Pre-Shipment Inspection for Electronics Orders from Shenzhen: What Overseas Buyers Should Check Before Shipment" at https://sourcingagencyinchina.com/article/pre-shipment-inspection-shenzhen-electronics
Published by Shenzhen Hardware Sourcing. This is an educational sourcing guide. It is not a legal opinion, factory audit, product certification or laboratory test report. Trade rules can change, and buyers should confirm the current rules for their exact product and destination market. This guide has not independently audited or verified any particular supplier. Where it shows an example, that example is labelled as illustrative or as our own buying record, and it does not describe a real customer transaction.